Davis Bacon fringe benefits calculator for credits and cash in lieu

Using the 2026 Cook County pipefitter fringe as an example, a $30.00 credit leaves $12.72 per hour to pay in cash.

Fringe credit · annualization · cash-in-lieu FICA

Calculator inputs

PIPEFITTER · Cook County, Illinois (IDOL, Aug 2026)Straight-time rate · B + F$102.22 /hr
Overtime · 1.5×B + F$131.97
Not 1.5×(B+F)$153.33
Annual package$230,834
Straight-time wages · 2,000 h × $59.50
$119,000
Overtime wages · 200 h × 1.5 × $59.50
$17,850
Fringe · 2,200 h × $42.72
$93,984
Annual cash wages
$136,850
Annual package
$230,834

OT = 1.5 × $59.50 + $42.72 = $131.97/hr — the fringe is paid hour for hour and is never multiplied by 1.5 (29 CFR § 5.32). Multiplying it would overstate OT by $21.36/hr.

Fringe credit · annualization

Annualized credit$30.00/hr
Fringe shortfall$12.72/hr
Cash in lieu$10,176
Credit = $30,000 ÷ 1,000 h (all hours)
$30.00/hr
Covered-hours-only credit (not allowed)
$37.50/hr
Cash in lieu · $12.72 × 800 covered h
$10,176
Employer FICA on cash in lieu · 7.65%
$778

Sources: 29 CFR § 5.32 · WHD Fact Sheet 66E (annualization) · IRS Pub. 15 (FICA 7.65%) · Rate schedule

Wage determination rates

Cook County, Illinois (IDOL, Aug 2026)
ClassificationBase BFringe FB + FOT 1.5×B + FAnnual package (2,000 h)
$58.51$46.82$105.33$134.59$210,660
$63.15$44.56$107.71$139.29$215,420
$64.19$48.84$113.03$145.13$226,060
$53.00$39.11$92.11$118.61$184,220
$56.30$36.96$93.26$121.41$186,520
$59.50$42.72$102.22$131.97$204,440
$56.85$48.26$105.11$133.54$210,220
$68.80$53.05$121.85$156.25$243,700

Cook County, Illinois (IDOL, Aug 2026) · Official schedule

What the Davis Bacon fringe benefits line measures

Davis-Bacon fringe benefits are part of the minimum compensation obligation under a federal wage determination. The sheet lists the required basic hourly wage and the fringe obligation for the job classification. As a numerical example, the August 2026 Cook County building pipefitter row lists $59.50 in base wages and $42.72 in fringe. That county row illustrates the arithmetic; the federal contract supplies the actual inputs.

Bona fide fringe benefits can include qualifying employer costs for medical coverage, pensions, and other eligible plans or programs. Before claiming a credit, verify which costs qualify and how the worker participates. Keep employee-funded deductions separate from employer contributions. The fact that a payment appears on a payroll or agreement line gives you a starting point for review.

How to calculate Davis-Bacon fringe benefits across projects

Fringe benefit annualization converts an allowable benefit cost to an hourly credit. If a worker has $20,000 in eligible annual cost and 2,000 total hours split between covered and noncovered projects, the credit is $10.00 per hour by the general method. Charging it against 800 covered hours alone would produce $25.00 an hour and overstate the credit by $15.00 in that example.

Use the worker’s covered and noncovered hours for the representative period and document the cost and eligibility. Check DOL’s rules for exceptions before excluding any hours. If multiple plans apply, calculate the permitted credit under each applicable rule, keep the separate records, and bring the total into the prevailing wage fringe benefits calculator as the hourly eligible contribution.

How to calculate fringe benefits for prevailing wage when credits fall short

With a $42.72 obligation and a $30.00 credit, cash in lieu of fringe benefits covers $12.72 an hour. Added to the $59.50 base, it produces $72.22 in straight-time cash. Over a 40-hour week, the worker gets $2,888.80 in gross cash and receives $1,200 in credited benefits. Together they total the $4,088.80 wage and benefit obligation.

If the approved credit is zero in that same illustration, the cash requirement is $102.22 an hour. Cash-in-lieu fringe benefits belong in wages for applicable withholding and payroll taxes. The employer’s payroll cost can differ between two options with the same wage-plus-fringe value, so compare gross cash, the employer’s benefit costs, and applicable taxes as separate amounts.

Review premium hours and preserve the credit calculation

Model five premium hours with the same example and an applicable regular rate of $59.50. At time and a half, hourly cash is $89.25 + $12.72 = $101.97 and eligible benefits remain $30.00 per hour in that simplified federal illustration. If excess cash is really part of the regular rate, check the overtime obligation again before excluding any of it.

Keep the wage determination, workweek time records, contributions, and annualization calculation together. Show how each employee’s wage and fringe obligations were satisfied. Where someone changes classifications, repeat the shortfall calculation for each set of hours with its own required rate. Follow the project’s premium rules and any separately applicable state or local schedules.

Frequently asked questions

What does Davis-Bacon fringe include?

The requirement can be met with eligible employer benefits, cash, or a combination. Medical or pension contributions may count when they meet the rules. Under the 2026 example’s $42.72 fringe, $30.00 of approved contributions leaves $12.72 in cash.

Does prevailing wage include fringe benefits?

Yes. Applicable wage determinations list a basic cash rate and any required fringe. For the 2026 county example, $59.50 plus $42.72 gives a $102.22 straight-time obligation.

What is covered under fringe benefits?

Qualifying medical, retirement, and other bona fide plans can count subject to program and credit rules. For the 2026 example, $20,000 in eligible costs over 2,000 total work hours produces a $10.00 hourly credit under general annualization.

What is fringe pay in construction?

It is the benefit or eligible cash value required in addition to the basic wage on covered work. In the 2026 example, paying all $42.72 in cash on top of $59.50 brings gross straight-time pay to $102.22 per hour before deductions.